You are here: Valve World Expo. News. Exhibitor News Archiv.
Installation of New Sand Preparation and Reclamation Plant from IMF ITALY
Installation of New Sand Preparation and Reclamation Plant from IMF ITALY
08/02/2012
Shree Hans Alloys Limited
Installation of NEW SAND PREPARATION & RECLAMATION PLANT from IMF ITALY at SHREE HANS ALLOYS LTD. based in Dholka, Gujarat (INDIA).
Equipment / Processes installed towards superior production such as:
- IMF Italy T36/ 30-S & T36/10-S continuous mixer delivering chemically bonded sand for moulding @ 30 tonnes per hour & 10 tonnes per hour respectively
- Vibratory table for mould compaction
- 2 Part No Bake Alpha Set Sand System (Ester Cured)
- IMF Italy 8 tonnes per hour reclamation plant
- 72” shot blasting with a capacity of 2.3 tonnes in one batch
- 4 Dust Collectors from DISA Make is available in strategic
location to take care of the pollution risk in the foundry.
Please contact us at marketing@hansalloys.com or visit us at www.hansalloys.com for more information.
Kind regards
Anurag D Daga (Director)
SHREE HANS ALLOYS LIMITED
Cell #: +91 98252 08825
